top of page

DESCRIPTION The patent pending Time Delay Gas Lift (TDGL) ™ system from Shale Oil Tools allows you to safely run gas lift equipment during an initial tubing installation. During installation, the TDGL™ system protects gas lift valves with a barrier that dissolves after a pre-determined period so that full open gas lift capabilities exist when required.

FEATURES • Utilizes proven gas lift technology • Fits standard gas lift mandrels • Configurable delay periods via metallurgies customized for unique annular fluid environments and temperatures

BENEFITS • Safely circulate kill fluid during initial tubing installation if the well starts to come in without damaging the gas lift valve seats • Eliminates rig costs, lost production time and emissions related to future tubing swap and gas lift installation • Provides well control while running gas lift valves

Time Delay Gas Lift™ System

SKU: PSOTGLS001
$0.00Price
Call us for ordering details. (432) 232-1662
    bottom of page